This paper introduces the technological process, equipment characteristics and the benefit of vaporized cooling project of Consteel electric arc furnace.
介绍了康斯迪电弧炉汽化冷却项目的工艺流程、设备特点、经济效益。
A close relation between BF campaign and the control of furnace body cooling equipment is described in light of No. 1 BF production.
根据宝钢1号高炉的生产实践,论述了高炉长寿与炉体冷却系统的管理有着密切的关系。
The utility model belongs to the metallurgical equipment field, in particular relating to a grid plate-structure device inside a secondary cooling system of a pellet shaft furnace.
本实用新型属于冶金设备领域,特别涉及球团竖炉的二次冷却系统中的篦板结构的装置。
应用推荐